(703) 945-7584 Get a quote ↗

CHANTILLY / DC · MARYLAND · VIRGINIA

Section 12 36 40 stone countertop scope

Read the project specification, then the details.

The Stone Studio can review stone countertop scopes identified under Section 12 36 40 with the project’s drawings and finish schedule. Section numbering and requirements vary by project: the issued specifications govern the material, submittals, fabrication and installation requirements.

Discuss your project ↗
BACA sawjet and operator station at The Stone Studio fabrication shop in Chantilly
Our Chantilly shop. Walk-ins welcome for slab viewing. Mon–Fri 7 AM–6 PM, Sat 7 AM–4 PM, Sun 12–4 PM.

Reconcile tags across the drawing set

Include the countertop section, finish schedule, elevations and casework details. Check that material tags agree across them. Identify thickness, finish, edges, splash, supports and sink conditions where specified. Flag contradictions for resolution rather than filling missing requirements with a generic standard.

Prepare for submittal review

The shop supports shop drawings, seam diagrams and related countertop documentation. Before procurement, clarify who reviews the package, what samples are required, and which substitutions or alternates are allowed. Send the project specification with your plans so we can review the countertop requirements.

BEFORE YOU VISIT

Is Section 12 36 40 always the right section?

Send the countertop specification issued for your project together with the drawings, even if its section number differs.

Where do I start?

Browse our project gallery, full slabs or remnants. Then start a project inquiry with your layout, project location and any contractor or designer already involved. We confirm scope and current material availability with you.

Call ↗ Start a project ↗